PREDIKSI JUMLAH PENUMPANG ARMADA BUS PT. RAJA PERDANA INTI (RAPI) DENGAN SIMULASI MONTE CARLO

Authors

  • Wenny Marta Dolok Saribu Universitas Islam Negeri Sumatera Utara
  • Riri Syafitri Lubis Universitas Islam Negeri Sumatera Utara
  • Hendra Cipta Universitas Islam Negeri Sumatera Utara

DOI:

https://doi.org/10.51401/jinteks.v5i3.2748

Keywords:

Monte Carlo, Prediction, PT. Raja Perdana Inti, Monte Carlo Simulation

Abstract

Prediction is an attempt to predict or predict something that will happen in the future by utilizing various relevant information at previous times through a scientific method. With the simulation system for predicting the number of passengers, it is hoped that it can predict the number of incoming passengers every day which will assist the company in determining the departure schedule for the PT. Raja Perdana Inti (RAPI). Monte Carlo can be used to find mathematical solutions consisting of many variables that are difficult to solve. The Monte Carlo simulation also applies a prediction simulation application as well as tests the level of accuracy and efficiency generated using this simulation. Based on the research, the prediction of the number of passengers in the bus fleet of PT. Raja Perdana Inti (RAPI) is 18719 people.

References

Aminah, Siti “Transportasi Publik dan Aksesibilitas Masyarakat Perkotaan,” Jurnal Teknik Sipil UBL., vol. 9, no. 1, 2018.

Naviani R, “Faktor-faktor yang berhubungan dengan perilaku menggunakan sabuk keselamatan pada sopir bus antar kota di Terminal Terboyo Semarang,” Semarang Fakultas Kesehataan Universitas Dian Nuswantoro, 2015.

Cahyadi, R.A, A. Aman, and F. Hanum, “Model Penjadwalan Keberangkatan Bus Dengan Strategi Alternating Deadheading: Studi Kasus Di PO Raya,” JMA., vol. 12, no. 2, 2013.

Astia, Rani Yunima, J. Santony, and Sumijan, “Prediction Of Amount Of Use Of Planning Family Contraception Equipment Using Monte Carlo Method (Case Study In Linggo Sari Baganti District),” Indonesian Jurnal of Artificial Intelligent and Data Mining (IJAIMD)., vol. 2, no. 1, 2019.

Siringo, Anggiat Marubah, “Simulasi Optimalisasi Jadwal Keberangkatan Kapal Ferry Dengan Metode Monte Carlo (Studi Kasus Di Pelabuhan Internasional Sekupang Batam),” Jurnal ISD., vol. 2, no. 2, 2017.

Subandi, D. Nur Fajrin, A. Gunawan, “Sistem Penjaadwalan Keberangkatan Dan Perolehan Penumpang Bus AntarKota,” Jurnal Manajemen Bisnis dan Logistik (JMBTL)., vol. 4, no. 3, 2018.

Wijaya, Felix Septian, Hendrik Sulistio. “Penerapan Metode Monte Carlo Pada Penjadwalan Proyek Serpong Garden Apartment,” Jurnal Mitra Teknik Sipil., vol. 2, no. 3, 2019.

Shofa, Widya Nurul, I. Soejanto, and T. Ristyowati, “Penjadwalan Proyek Dengan Penerapan Simulasi Monte Carlo Pada Metode Program Evaluation Review And Technique (PERT),” Jurnal Optimasi Sistem Industri., vol. 10, no. 2, 2017

Santony, Julius, “Simulasi Penjadwalan Proyek Pembangunan Jembatan Gantung Dengan Metode Monte Carlo,” Jurnal Informasi dan Teknologi., vol. 2, no. 1, 2020.

Astia, Rani Yunima, Julius Santoni, Sumijan, “Prediction Of Amount Of Use Planning Family Contraception Equipment Using Monte Carlo Method (Case Study In Linggo Sari Baganti District),” Indonesian Journal Of Artifical Intelligence and Data Mining., vol. 2, no. 1, 2019.

Published

2023-08-11

How to Cite

[1]
W. M. Dolok Saribu, Riri Syafitri Lubis, and Hendra Cipta, “PREDIKSI JUMLAH PENUMPANG ARMADA BUS PT. RAJA PERDANA INTI (RAPI) DENGAN SIMULASI MONTE CARLO”, JINTEKS, vol. 5, no. 3, pp. 420-424, Aug. 2023.

Issue

Section

Articles