ANALISIS RISIKO HAZARD DI PT. SUN ENERGY PADA SITE PROJECT PT. PP (PERSERO) MENGGUNAKAN METODE HAZARD AND OPERABILITY STUDY (HAZOP)
DOI:
https://doi.org/10.36761/hexagon.v5i2.4072Keywords:
HAZOP, K3, Kesehatan Kerja, Kecelakaan KerjaAbstract
As a company that operates in the field of solar power system project development, of course there are many risks at PT Surya Utama Nuansa (SUN Energy), such as during installation and during maintenance. Therefore, employees are required to use personal protective equipment, but based on observations, potential dangers were found in the form of piles of damaged inverters or other materials in random locations and workers lifting solar panels alone, as well as scattered electrical cables. The aim of this research is to provide a solution to reduce the risk of work accidents. The method used in this research is the HAZOP (Hazard and Operability Study) method. Based on the results of the identification and assessment of potential hazards that have been carried out, there are 5 potential hazards, namely a moderate risk level of 27%, a high risk level of 20%, and an extreme risk level of 53%. And it is known that there is a 40% potential hazard in the work attitude classification. 20% on work procedure classification, and 40% on workplace classification. This shows that potential hazards in workplace classification require more attention in efforts to prevent work accidents. It is hoped that this research will implement health and safety at the PT project site. PP (Persero) has been repaired so that it can minimize the occurrence of work accidents while carrying out activities on the site.
References
Adiasa, I. (2022). Analisis Potensi Bahaya Pada PT. Infrastruktur Terbarukan Buana Mengunakan Metode Hazard Identification and Risk Assessment (HIRA) Lombok Timur. Jurnal Industri dan Teknologi Samawa, 3(1), 54-61.
Adiasa, I., Hudaningsih, N., Riski, I. W., & Ruskartina, E. (2022). Analisis Potensi Bahaya Pada Pekerjaan Drainase Pada Proyek Pengendalian Banjir Di PT. Brantas Abipraya (Persero) Menggunakan Metode Hazard Identification and Risk Assessment (HIRA). Jurnal Industri dan Teknologi Samawa, 3(2), 80-91.
Adiasa, I., Wau, N. S. H., & Hudaningsih, N. (2023). Analisis Potensi Bahaya Pada Pekerjaan Bangunan Operasional Bendungan Tiu Suntuk Di PT. Nindya Karya (Persero) Menggunakan Metode Hazard Identification And Risk Assessment (HIRA). Jurnal Industri dan Teknologi Samawa, 4(2), 87-97.
Adiasa, I., Marsiwah, A. A., & Budianto, B. A. (2024). Analisis Kesehatan Dan Keselamatan Kerja (K3) Menggunakan Metode Hazard Identification And Risk Assessment (HIRA) Pada Bagian Silo Di PT. Santosa Utama Lestari Moyo. Jurnal Industri dan Teknologi Samawa, 5(1), 21-30.
Aprilia, S. P., Suhardi, B., Astuti, R. D., & Adiasa, I. (2020). Analisis Risiko Keselamatan dan Kesehatan Kerja Menggunakan Metode Hazard and Operability Study (HAZOP): Studi Kasus PT. Nusa Palapa Gemilang. Performa: Media Ilmiah Teknik Industri, 19(1).
Atmaja, J., Suardi, E., Natalia, M., Mirani, Z., & Alpina, M. P. (2018). Penerapan sistem pengendalian keselamatan dan kesehatan kerja pada pelaksanaan proyek konstruksi di Kota Padang. Jurnal Ilmiah Rekayasa Sipil, 15(2), 64-76.
Azhar, M., & Satriawan, D. A. (2018). Implementasi kebijakan energi baru dan energi terbarukan dalam rangka ketahanan energi nasional. Administrative Law and Governance Journal, 1(4), 398-412.
Hutauruk, R. P. S. (2021). Pengaruh Infrastruktur Terhadap Pertumbuhan Ekonomi di Kabupaten Simalungun. Jurnal Ekuilnomi, 3(1), 24-37.
Kholiq, I. (2015). Analisis pemanfaatan sumber daya energi alternatif sebagai energi terbarukan untuk mendukung subtitusi BBM. Jurnal Iptek, 19(2), 75-91.
Priatam, P. P. T. D., Zambak, M. F., Suwarno, S., & Harahap, P. (2021). Analisa Radiasi Sinar Matahari Terhadap Panel Surya 50 WP. RELE (Rekayasa Elektrikal dan Energi): Jurnal Teknik Elektro, 4(1), 48-54.
Rahmanto, I., & Hamdy, M. I. (2022). Analisa Resiko Kecelakaan Kerja Karyawan Menggunakan Metode Hazard and Operability (HAZOP) di PT PJB Services PLTU Tembilahan. Jurnal Teknologi dan Manajemen Industri Terapan, 1(2), 53-60.
Rejekiningrum, P., & Kartiwa, B. (2017). Pengembangan sistem irigasi pompa tenaga surya hemat air dan energi untuk antisipasi perubahan iklim di Kabupaten Bantul, Daerah Istimewa Yogyakarta. Jurnal Tanah dan Iklim, 41(2), 159-171.
Restuputri, D. P., & Sari, R. P. D. (2015). Analisis kecelakaan kerja dengan menggunakan metode Hazard and Operability Study (HAZOP). Jurnal Ilmiah Teknik Industri, 14(1), 24-35.
Ruskartina, E., Hudaningsih, N., & Adiasa, I. (2023). Analisis Risiko Hazard Pada Pembuatan Kemasan Kardus Menggunakan Metode Hazard And Operability Study Di UPTD. Balai Kemasan Produk Daerah NTB. Jurnal Industri dan Teknologi Samawa, 4(1), 24-32.
Sari, S., & Shalsabila, R. (2021). Analisis Risiko Keselamatan Dan Kesehatan Kerja Pada Proyek Konstruksi Gedung Pamjaya Menggunakan Metode Hazard Of Operability Study (HAZOP). VISIKES: Jurnal Kesehatan Masyarakat, 20(2).
Savitri, E. D. Y., Lestariningsih, S., & Mindhayani, I. (2021). Analisis Keselamatan Dan Kesehatan Kerja (K3) Dengan Metode Hazard And Operability Study (HAZOP)(Studi Kasus: CV. Bina Karya Utama). Jurnal Rekayasa Industri (JRI), 3(1), 51-61.
Setiono, B. A., & Andjarwati, T. (2019). Budaya keselamatan, kepemimpinan keselamatan, pelatihan keselamatan, iklim keselamatan dan kinerja. Zifatama Jawara.
UNSW Health and Safety. (2008). Risk Management Program. Canberra: University of New South Wales. https://safety.unsw.edu.au/riskmanagement-program
Qowiyuddin, M. (2023). Analisis Keselamatan Dan Kesehatan Kerja Dengan Metode Hazard And Operability (HAZOP) Pada Proyek Pembangunan Perumahan Oleh PT. XYZ. Jurnal Serambi Engineering, 8(4), 7422-7429.
Published
Issue
Section
Copyright (c) 2024 Hexagon

This work is licensed under a Creative Commons Attribution 4.0 International License.