Renewable Energy Development Potential Analysis In Sumbawa District Using Homer 3.14 For Projects Up To 25 Years

Potensi Energi Terbarukan di Kabupaten Sumbawa

Authors

  • Arief Budiman Universitas Teknologi Sumbawa
  • Indra Darmawan Universitas Teknologi Sumbawa
  • Muhammad Hidayatullah Universitas Teknologi Sumbawa
  • Ahmad Jaya Universitas Teknologi Sumbawa

DOI:

https://doi.org/10.51401/altron.v2i01.1679

Keywords:

Energy analysis, Cost of Energy, HOMER, Net Present Cost

Abstract

Renewable energy potential if it is used for the development of a power generation system to supply the needs of the electricity load, especially in Sumbawa Regency for the next 25 years, can be simulated using software. The purpose of this study was to determine the potential of EBT as an alternative supply of Sumbawa's electricity needs. The research method used is a quantitative method in the form of secondary data collection from BMKG and PLN then analyzed using software HOMER 3.14. So that simulation modeling and calculations can be carried out for the potential for the next 25 years. From the modeling that has been done, the sensitivity of the received solar radiation is large Solar Cell around 5.59 kWh//day and the average wind speed on the turbine is 5 m/s Net Present Cost (NPC) as big Rp.717,113,700,000 and Cost of Energy (COE) Rp. 1,191.19. This means that this modeling can generate profits for PLN of Rp.7.666.946.930 per year.

References

Ammar Rahmatan Lil Alamin, “Audit Energi Pada Gedung Universitas Sumbawa,” 2020

Asngari, Ade Putra, A., “Analisis Potensi PLTH (Angin Dan Surya) Di Pantai Losari Makassar Menggunakan Homer,” 61, 2020

Bachtiar, I. K., & Syafik, M. “Rancangan Implementasi Pembangkit Listrik Tenaga Surya (PLTS) Skala Rumah Tangga menggunakan Software HOMER untuk Masyarakat Kelurahan Pulau Terong Kecamatan Belakang Padang Kota Batam,” vol. 5(02), 2016

Haryhanto, A., “Energi Terbarukan,” vol. 15, 2017

Huda Failasufa, Dr. Eng. F. Danang Wijaya, S.T., M.T., Dr. Eng, Wahyu Wilopo, S.T., M. E., “Analisis Potensi Penerapan Energi Hibrida Untuk Pemenuhan Kebutuhan Listrik Menggunakan Homer,” Studi Kasus?: Desa Komor, Kecamatan Unir Sirau, Asmat, Papua, 2019.

Kurniasih, N., & Nazir, R. (2015). Analisis Mode Sistem Pembangkit Listrik Tenaga Hibrid Microhydro Dan Photovoltaic Array Menggunakan Homer di Indonesia Terutama Provinsi Sumatera. 1, 30–40.

Okinawa Enetech Co., I., “HOMER (Hybrid Optimization of Multiple Electric Renewables)”, Core Capabilities. 1, 19, 2016.

Saputra, I, “Tugas Akhir Indra Saputra. Andra Saputranalisis Potensi Pembangkit Listrik Tenaga Hibrida Pada Pesisir Pantai Labu Menggunakan Software Homer,” 72, 2016.

Sean Yudha Yahya, Ir. Soeprapto., Ir.Teguh Utomo., M., “Analisis PLH Di Pulau Mandangin Sampang, Madura Menggunakan Software HOMER” [2]:1, 1–6, 2014.

Sukmawidjaja, M. dan Ilham, A., “Simulasi Optimasi Sistem PLTH Menggunakan Software Homer Untuk Menghemat Pemakaian BBM Di Pulau Penyengat Tanjung Pinang Kepulauan Riau,” 11, 17–42, 2013.

Sumbawa, B. K., “Statistik Kabupaten Sumbawa 2021,” 78, 2022.

Sunanda., W., & Gusa, R. F., “Pemodelan Sistem Pembangkit Listrik Hybrid Diesel Generator Diesel Generator Dan Photovoltaic Array Menggunakan Perangkat Lunak Homer,” ( Studi Kasus di Pulau Semujur Kabupaten Bangka Tengah ), 17, 2017 :https://doi.org/10.33019/ecotipe.v2i2.35

Syahir, Ahmad., Jainuri, M., Tinjauan Pustaka. “Convention Center Di Kota Tegal,” vol. 4(80), 4, 2017

UP3 PLN. (n.d.), “Beban Listrik Sumbawa”

Wierawansyah. E., Imam dan Arief Pasadita, “Potensi Energi Baru Terbarukan di Provinsi Nusa Tenggara Barat,” 5, 0–9, 2020

Yadnya, M. S., Zubaidah, T., Zainuddin, A., & Kanata, B. (2019). Sosialisasi Potensi Energi Terbarukan Angin (Bayu) Antara Universitas Mataram (Unram) Bekersama Dengan Uversitas Teknologi Sumbawa (UTS) Di Pulau Sumbawa. 1(1), 22–26, 2019

XANT M-21 turbine output power

Additional Files

Published

2023-02-13

How to Cite

Budiman, A., Darmawan, I., Hidayatullah, M., & Jaya, A. (2023). Renewable Energy Development Potential Analysis In Sumbawa District Using Homer 3.14 For Projects Up To 25 Years: Potensi Energi Terbarukan di Kabupaten Sumbawa. Journal Altron; Journal of Electronics, Science &Amp; Energy Systems, 2(01), 1–9. https://doi.org/10.51401/altron.v2i01.1679

Most read articles by the same author(s)

1 2 3 4 5 > >>